| River Campus | Student Life
Center | Greenbaum Center for Jewish Life |
![]() |
| Artist's Rendering |
The two-story, 15,000-square-foot building on Intercampus Drive, next to Library Lot, will add new gathering, rehearsal, and programmatic space on the River Campus for all students. The second level will be the Greenbaum Center for Jewish Life, a new home for Hillel at the University. The new facility is scheduled to open in fall 2027..
References
2026 Construction
begins on new building for Student Life, Greenbaum Center for Jewish
Life
© 2026 Morris A. Pierce